Ridgeway
2 story renter occupied duplex. Scope of work included a complete earthquake retrofit including anchor bolting, hold downs and sheer paneling; replacement of all window units to insulated glass, and structural improvements to the wood frame.
The final phase of project was re-siding the entire building. First floor siding was a cementatious (light weight concrete lap siding). Second floor was wood shingles with decorative patterns incorporated into the shingling.

Contact Information
| vaneveryconstruct@mac.com |
| (510) 839-5810 |
| (510) 839-5811 |

Looking for our Residential Work?
We have a substantial residential property portfolio right here at your fingertips.



